Art
J-GLOBAL ID:201702278140428343   Reference number:17A1969311

Determining bid markup and resources allocated to cost estimation in competitive bidding

競争入札におけるコスト推定に割り当てられた入札マークアップと資源の決定【Powered by NICT】
Author (3):
Material:
Volume: 85  Page: 358-368  Publication year: 2018 
JST Material Number: W0491A  ISSN: 0926-5805  Document type: Article
Article type: 原著論文  Country of issue: Netherlands (NLD)  Language: ENGLISH (EN)
Abstract/Point:
Abstract/Point
Japanese summary of the article(about several hundred characters).
All summary is available on JDreamIII(charged).
On J-GLOBAL, this item will be available after more than half a year after the record posted. In addtion, medical articles require to login to MyJ-GLOBAL.
To win a project contract thro...
   To see more with JDream III (charged).   {{ this.onShowAbsJLink("http://jdream3.com/lp/jglobal/index.html?docNo=17A1969311&from=J-GLOBAL&jstjournalNo=W0491A") }}
Thesaurus term:
Thesaurus term/Semi thesaurus term
Keywords indexed to the article.
All keywords is available on JDreamIII(charged).
On J-GLOBAL, this item will be available after more than half a year after the record posted. In addtion, medical articles require to login to MyJ-GLOBAL.

Semi thesaurus term:
Thesaurus term/Semi thesaurus term
Keywords indexed to the article.
All keywords is available on JDreamIII(charged).
On J-GLOBAL, this item will be available after more than half a year after the record posted. In addtion, medical articles require to login to MyJ-GLOBAL.
, 【Automatic Indexing@JST】
JST classification (3):
JST classification
Category name(code) classified by JST.
CAD,CAM  ,  Construction management  ,  Documentation 
Terms in the title (5):
Terms in the title
Keywords automatically extracted from the title.

Return to Previous Page