Art
J-GLOBAL ID:202002290145469798   Reference number:20A1236810

Consideration for the type of Construction Management Method and the system on execution, as example of the reconstruction projects for The Great East Japan Earthquake.

東日本大震災復興事業におけるCM方式導入事例に基づくCMタイプ選定と実施体制の検討
Author (2):
Material:
Volume: 75  Issue:Page: I_58-I_72(J-STAGE)  Publication year: 2019 
JST Material Number: U0303A  ISSN: 2185-6605  Document type: Article
Article type: 原著論文  Country of issue: Japan (JPN)  Language: JAPANESE (JA)
Thesaurus term:
Thesaurus term/Semi thesaurus term
Keywords indexed to the article.
All keywords is available on JDreamIII(charged).
On J-GLOBAL, this item will be available after more than half a year after the record posted. In addtion, medical articles require to login to MyJ-GLOBAL.

Semi thesaurus term:
Thesaurus term/Semi thesaurus term
Keywords indexed to the article.
All keywords is available on JDreamIII(charged).
On J-GLOBAL, this item will be available after more than half a year after the record posted. In addtion, medical articles require to login to MyJ-GLOBAL.

Author keywords (5):
JST classification (1):
JST classification
Category name(code) classified by JST.
Construction management 
Reference (31):
more...
Terms in the title (6):
Terms in the title
Keywords automatically extracted from the title.

Return to Previous Page