Rchr
J-GLOBAL ID:200901019227237857   Update date: Nov. 14, 2019

Hino Rei

ヒノ レイ | Hino Rei
Affiliation and department:
Job title: Professor
Research keywords  (3): Manufacturing Systems ,  Manufacturing Process ,  Production Engineering
Papers (12):
  • Rei Hino, Michitaka Harada. Development of a Transportation System with Multiple Conveyor Belts - Conditions for Transportation and Scheduling -. Journal of the Japan Society for Precision Engineering. 2012. 78. 12. 1105-1111
  • Takehiro Hayasaka, Rei Hino. Multiple Exchanges of Job Orders for No-Buffer Job Shop Scheduling Problem. 2012. 6. 5. 661-671
  • Rei Hino, Daisuke Uekawa, Masanori Morikawa, Norikazu Suzuki, Eiji Shamoto. *Study on Re-entrant Flowshop Scheduling Problem(1st report)Optimization by Mathematical Programming. 2008. 74. 10. 1119-1124
  • Rei Hino. *Job Shop Scheduling Focusing on Role of Buffers(3rd Report, Optimization by Mixed-Integer Programming). The Japan Society of Mechanical Engineering. 2008. 74. 742. 1669-1675
  • Rei Hino, Yasuhiko Kobayashi, Norikazu Suzuki, Eiji Shamoto. *Study on Production Scheduling with Consideration of Synchronized Operations by Multiple Resources. Journal of the Japan Society for Precision Engineering. 2007. 73. 7. 834-839
more...
MISC (12):
  • Rei Hino, Michitaka Harada. Development of a Transportation System with Multiple Conveyor Belts - Conditions for Transportation and Scheduling -. Journal of the Japan Society for Precision Engineering. 2012. 78. 12. 1105-1111
  • Takehiro Hayasaka, Rei Hino. Multiple Exchanges of Job Orders for No-Buffer Job Shop Scheduling Problem. 2012. 6. 5. 661-671
  • Rei Hino, Daisuke Uekawa, Masanori Morikawa, Norikazu Suzuki, Eiji Shamoto. *Study on Re-entrant Flowshop Scheduling Problem(1st report)Optimization by Mathematical Programming. 2008. 74. 10. 1119-1124
  • Rei Hino. *Job Shop Scheduling Focusing on Role of Buffers(3rd Report, Optimization by Mixed-Integer Programming). The Japan Society of Mechanical Engineering. 2008. 74. 742. 1669-1675
  • Rei Hino, Yasuhiko Kobayashi, Norikazu Suzuki, Eiji Shamoto. *Study on Production Scheduling with Consideration of Synchronized Operations by Multiple Resources. Journal of the Japan Society for Precision Engineering. 2007. 73. 7. 834-839
more...
Books (1):
  • Smart Devices and Machines for Advanced Manufacturing
    Springer 2008 ISBN:9781848001466
Lectures and oral presentations  (2):
  • Optimization by Pre-assignment of Processes for Re-entrant Flowshop Scheduling Problem
    (2012 International Symposium on Flexible Automation 2012)
  • Cyclic Scheduling and Re-scheduling in Response to Change of Product Mix
    (2010 IEEE International Conference on Systems, Man and Cybernetics 2010)
Education (1):
  • 1988 - 1990 Kobe University Graduate School, Division of Engineering Department of Mechanical Engineering
Professional career (1):
  • Dr. Engineering (Kobe University)
Work history (4):
  • 2016/04/01 - 現在 Nagoya University Professor
  • 2014/04/01 - 2014/09/15 Nagoya University Associate professor
  • 2008/04/01 - 2014/03/31 Nagoya University Associate professor
  • 2008/03/31 - Nagoya University Lecturer
Association Membership(s) (1):
Society for Serviceolgy
※ Researcher’s information displayed in J-GLOBAL is based on the information registered in researchmap. For details, see here.

Return to Previous Page